November 8, 2006—Strains on the US power delivery system are beginning to show, with the current system characterized by aging infrastructure, significant underinvestment and outdated technologies, according to a Fitch Ratings report.

Market participants and regulators are placing new functions on the system, such as facilitating competitive regional markets for which it was not designed, the report says.

Over the past decade, most transmission investment was directed toward constructing new facilities to meet demand, rather than refurbishing existing equipment, says the report. According to the US Department of Energy (DOE), 70% of the transmission lines are 25 years or older, 70% of power transformers are 25 years or older, 60% of circuit breakers are more than 30 years old.

Compounding these problems are the duel challenges of parts availability and obsolescence of older equipment. Electricity demand and generation has doubled over the past 30 years and that, along with the advancement of wholesale power markets, transfers of large amounts of electricity across the network have increased significantly.

Transmission constraints, while not affecting power supply, have led to material financial consequences in cases where lower cost power was unable to be delivered.